Largo Green (LG) called upon this church with 2 large buildings covering approx. 10,000 sf. The side-by-side rectangular buildings were in dire need of upgrades to all 4 HVAC systems. LG assessed the environment, heat loads, ventilation, access points, and proposed viable options.
LG worked with the church Elders and church owner (who had 40 years HVAC experience himself !). LG served as the project manager for the design and installation of 4 Carrier 5-ton, 17 Seer, Puron, electric systems. 2 were vertical and 2 were horizontal configurations. All required fresh-air makeup ductwork. Additional ductwork, registers, reducers, & grilles were added to supplement the trunkline design which wasn't adequately cooling multiple rooms/areas.