Client wanted to expand the look & feel of older interior room designs. Removing a room divider wall was necessary. LG consulted with a structural engineer to determine load bearing aspects. Engineer determined must kappa portions to maintain structural integrity. LG maneuvered around those load bearing sections. LG carefully removed drywall, electric, & plumbing. Then rebuilt the areas near ceiling etc. that kept the new wall in tact.